Reports and photos

This crew builds new or reroutes existing trails. Laura Leon leads the crew, which usually works on Thursdays.

Reports and photos organized by year from 2018 can be accessed below.

Silent slideshows provide a review of an entire year’s activities in just a few minutes.

Photos can be displayed as a list of file names or as a gallery of thumbnails (Tiles) as shown to the right.

Files can be downloaded using the menu at the top left. Selecting multiple files downloads a zip file.

Photo credits can be found in project leader reports.

Click to access 39 reports of 2024 activities.
Click to watch a slideshow of 2024 trail construction crew activities (12:55). Major projects include Lower Pine and Ellis Trail reroutes. Reports and most photos by Laura Leon.
Click to access 393 images of 2024 activities.
Click to access 37 reports of 2018 activities.
Click to watch a slideshow of 2018 trail construction crew activities (11:05). Almost all of the reports were written by Bob Galloway and photos taken by Betsy Galloway at the beginning of the multiyearCienega/Armijo Trail Improvement Project. Many thanks to Jenny Blackmore for providing the reports and photos as they can no longer be retrieved from the Yahoo mailserver used at the time.
Click to access 337 images of 2018 activities.